agile scrum software development process

Sprint Review 60

Topics include: Carousel tweaks, catalog item styling, Step Numbers on How To,

Author: Digital Solutions

New Features 

  • We took your feedback to heart regarding the changes to the Carousel made during Sprint 58. The new carousel overlay with text vertically aligned hid too much of the image. We fine-tuned the overlay to a linear gradient overlay from bottom to top and repositioned the text to the bottom left. 

Updates & Fixes

  • Many of you observed that the main menu items had a bottom scroll bar that went horizontally, that has been removed.
  • Step numbers are now back on the "How To" content type.
  • The rollover effect on unlinked profile cards has been removed.
  • The statistics card now has an upper limit of five seconds to meet usability requirement.
  • Many accessibility fixes have been made to the county map of North Carolina:
    • The colors now have a description on hover.
    • Map links in the Text Version were not visible on hover if the map is in a band with a dark background color.
    • Keyboard navigation on the Text Version of the map has improved focus and more logical interaction. 

In Case you Missed it

Improvements shared during our last Sprint Review 58 on (We skipped 59 and went to 60 due to a hiccup with Jira)

All Past Sprints

 

Related Topics: